North Delta Regional Planning & Development District, Inc.

1913 Stubbs Ave., Monroe, LA   71201                                                                                                                (318) 387-2572

hndshak3.wmf (10422 bytes) Contact us:

David Creed david@northdelta.org
Louise Collins louise@northdelta.org
Lanell Winston lanell@northdelta.org
Leona Lewis leona@northdelta.org
Douglas Mitchell doug@northdelta.org
Herber Dean Reed hdreed@northdelta.org
Ken Newman ken@northdelta.org
Tracy Ausberry tracy@northdelta.org
Dot Crain dot@northdelta.org
  @northdelta.org
Office office@northdelta.org

 

 

Federal Highways Administration and Federal Transit Administration

Funded through the Federal Highways Administration and the Federal Transit Administration, with matching funds from local government, this program allows northeast Louisiana in attaining Federal and State grants for infrastructure development and improvement and assists the City of Monroe in improving its transit system.  With respect to metropolitan planning, OCOG's main objectives are to discuss the planning priorities facing the metropolitan planning area and describe all metropolitan transportation activities. OCOG is the Monroe MPO, as designated by the Governor and local governments. As such, OCOG must consider all modes of transportation within the planning area boundaries that are determined by the MPO and Governor.

MTP, TIP & WPWP

OCOG provides the metropolitan area with a 20-year long-range Metropolitan Transportation Plan (MTP) that includes a 8 year program of projects (TIP), Work Program (UPWP).  

 

Transportation Improvement Program

Funded through the Federal Highways Administration and the Federal Transit Administration, with matching funds from local government, the TIP is a 8 year program of projects that must be fiscally constrained. The MPO must provide opportunity for public review. Projects are selected cooperatively by the MPO and State and incorportated into the STIP without modification. The TIP must be updated at least every two years, and includes an annual listing of projects with funds obligated.

FY 02-03 10/1/02-9/30/03 TIP-YEAR 1 02-03        
LADOTD ID PROJECT PROJECT PROJECT WORK EST COST FEDERAL COST
NUMBER NAME DESCRIPTION IMPROVEMENT PHASE   (IN $1,000)
742-37-0004 ROWLAND DR. ROWLAND RD TO US 80 OVERLAY C   $466
742-37-0005 FINKS HIDEAWAY LA. 139 TO LA.594 OVERLAY C   $678
742-37-0006 BAYOU OAKS US 165 TO LA139 OVERLAY C $78.5 $393
742-37-0007 FINKS HIDEAWAY RAYMOND TO BAYOU OAKS OVERLAY C $95.25 932
837-17-0007 LA617 THOMAS RD I-20 TO US 80 WIDEN TO 5 LN C $755.5 $3,022
742-37-0009 OLD STERLINGTON RD US165 TO FINKS HIDE. WIDEN TO 4 LN PE/EIS $171.5 $686
    TIP YR 2 03-04        
742-06-0050 FINKS HIDEAWAY PHASE I US165 TO HOLLAND DR WIDEN 2 TO 5 LANES R/W &U   $108
002-01-0041 US 80(DESIARD ST) US165 TO GILBERT WIDEN TO 5 LANES R/W&U   $450
    TIP YR 3 04-05        
002-01-0041 US 80(DESIARD ST) US165 TO GILBERT WIDEN TO 5 LANES C $382.5 $1,530
    TIP YR 4 05-06        
742-06-0050 FINKS HIDEAWAY PHASE I US165 TO HOLLAND DR WIDEN 2 TO 5 LANES C $580 $2,320
742-06-0050 FINKS HIDEAWAY PHASE II HOLLAND TO RAYMOND WIDEN 2 TO 5 LANES C   $3,948
    TIP YR 5 06-07        
    TIP YR 6 07-08        
    TIP YR 7 08-09        
    TIP YR 8 09-10        
742-37-0009 OLD STERLINGTON RD US165 TO FINKS HIDE. WIDEN TO 4 LN R/W $16.51 $67
742-37-0009 OLD STERLINGTON RD US165 TO FINKS HIDE. WIDEN TO 4 LN C $1,733 $6,933
             
  YR 1,2,3,4,5,6,7,8 TOTAL $21,531,666